top of page
Search

Completed: Asphalt Clubhouse Driveway

The driveway along the west side of the clubhouse became a muddy path during the rain. To keep this path accessible to vehicles and work crews it has been paved with asphalt. This was completed in April of 2019 thanks to Lunny Engineering and Mak Engineering.




Comentários


Os comentários foram desativados.
bottom of page